Skip to content

TERANG ASIA SDN BHD

COMMITTED TO SUPERIOR QUALITY & RESULTS

  • HOME
  • SERVICES
  • PORTFOLIO
  • TIMELINE
  • CONTACT US
  • CAREER

Tags: TA Timeline

  • Home
  • Timeline Posts
  • TA Timeline
Posted on 12Dec

Batu Kawan, Pulau Pinang

Linde BKIP Project

Read More
Posted on 12DecDecember 12, 2023

Intel, Pulau Pinang

Linde Pelican ASU Project

Read More
Posted on 12DecDecember 12, 2023

Lotte Chemical Titan Malaysia, Johor

Tanjung Langsat LUSR Project for Steel Structure and Mechanical Installation

Read More
Posted on 12Dec

Lotte Chemical Titan Malaysia, Johor

New Boiler Project (Steel Structure and Mechanical Installation)

Read More
Posted on 12DecDecember 12, 2023

Linde Pasir Gudang, Johor

PG3 Project Plant Extension with Steel Structure and Mechanical Installation

Read More
Posted on 12DecDecember 12, 2023

Majunaka Eco Energy

10MW Rice Husk Power Plant Civil, Steel Structure, Boiler, and Mechanical Installation

Read More
Posted on 05JunJune 5, 2018

Hyundai Rotem Engineering and Construction, Perak

Coal Conveyor Re-belting (TC-10)

Read More
Posted on 05Jun

Hyundai Rotem Engineering and Construction, Perak

Coal Conveyor Re-belting (TC-20)

Read More
Posted on 05JunJune 5, 2018

Lotte Chemical Titan Malaysia, Johor

Joint Venture with Grace Field Corporation for Steel Structure, Rotating, and Stationary Equipment Installation and Commissioning Work (TPP3 Project Package-2)

Read More
Posted on 05Jun

Lotte Chemical Titan Malaysia, Johor

Maintenance Work (Steel Structure and Equipment Demolition and Replacement Work)

Read More

Posts navigation

Older
Copyright © 2025 TERANG ASIA SDN BHD All Rights Reserved | Architectonic by Theme Palace
Visit us on Facebook!
Visit us on Facebook!