2023
Batu Kawan, Pulau Pinang

Linde BKIP Project

2023
Intel, Pulau Pinang

Linde Pelican ASU Project

2022
Lotte Chemical Titan Malaysia, Johor

Tanjung Langsat LUSR Project for Steel Structure and Mechanical Installation

2020
Lotte Chemical Titan Malaysia, Johor

New Boiler Project (Steel Structure and Mechanical Installation)

2018
Majunaka Eco Energy

10MW Rice Husk Power Plant Civil, Steel Structure, Boiler, and Mechanical Installation

2018
Linde Pasir Gudang, Johor

PG3 Project Plant Extension with Steel Structure and Mechanical Installation

2018
Hyundai Rotem Engineering and Construction, Perak

Coal Conveyor Re-belting (TC-10)

2017
Hyundai Rotem Engineering and Construction, Perak

Coal Conveyor Re-belting (TC-20)

2017
Lotte Chemical Titan Malaysia, Johor

Joint Venture with Grace Field Corporation for Steel Structure, Rotating, and Stationary Equipment Installation and Commissioning Work (TPP3 Project Package-2)

2017
Lotte Chemical Titan Malaysia, Johor

Maintenance Work (Steel Structure and Equipment Demolition and Replacement Work)

2017
Lotte Chemical Titan Malaysia, Johor

Joint Venture with Grace Field Corporation for Demolition Work (TPP3 Project)

2017
Lotte Chemical Titan Malaysia, Johor

Joint Venture with Grace Field Corporation for Turnaround Flare Stack Replace Work for Piping and Equipment Replacement (TPP3 Project)

2017
Oxen T&E(M) Sdn.Bhd. Johor

Foundation Cutting, Chipping, Form Work, Grouting, and Finishing Touch Up (TE-3 Project)

2017
Lotte Chemical Titan Malaysia, Johor

Miscellaneous Work (TE-3 Project)

2016
Lotte Chemical Titan Malaysia, Johor

Joint Venture with Grace Field Corporation for Steel Structure and Mechanical Installation for UTOS/Terminal & Jetty (TE-3 Project)

2016
Daelim Malaysia Sdn.Bhd., Perak

Supply of Manjung 5 Tank Farm Galvanized Serrated Platform

2016
Ngeam Engineering Works Sdn. Bhd, Perak

Installation for Coal Handling System for Third Import Conveyor Line (LBT Project)

2015
FTJ Bio Power Sdn. Bhd, Pahang

Existing Fuel Feeding System Modification Work

2015
Sagami Rubber, Ipoh

Plant Extension Project (Fabrication and Installation)

2015
Nippon Electric Glass, Selangor

Demolition for Fuel Handling Conveying System

2015
KPOM, Sabah

Erection of Waste Water Treatment Plant

2014
Tanjung Bin ATB Port, Johor

Loading Arm and Rotary Equipment Installation

2014
Lotte Chemical Titan Malaysia ,Johor

Stationary and Rotating Equipment Installation (MSS-R1 Project)

2014
Kerry Food Industrial Plant, Selangor

Plant Upgrade (Steel structure and Rotating Equipment)

2012
Petronas Oil and Gas, Terengganu

Stationary and Rotating Equipment Revamping Project (GPP2 Project)

2012
Lotte Chemical Titan Malaysia , Johor

Stationary and Rotating Equipment Installation (TBA Project)

2012
Sumitomo Heavy Industries, Port Klang

Testing Plant on EFB Handling System

2011
Samsung Corning, Negeri Sembilan

Production Equipment Demolition Work

2011
C.U Electronic, Negeri Sembilan

Building Structure Modification Work

2010
Thailand Government, Chunburi, Thailand

Bore Pilling Work, Rock Drilling, and Coring Work for Elevated Highway

2009
Kompleks Penapisan Minyak, Port Klang

Bore Pilling Work

2008
UOP Palm Oil Mill, Penang

30 TPH BI Drum Boiler Installation and Fuel Handling System Installation

2008
Artesian Fresh Sdn. Bhd., Brunei Darussalam

Fabrication and Installation of 20,000 lpd Quantum Resonance Water Processing System

2008
Thailand

Attended Bore Pilling Training

2007
Evergreen Manufacturing Sdn Bhd, Selangor

Fabrication and Installation of 20,000 lpd Quantum Resonance Water Processing System

2007
Perusahaan Membalak Sdn.Bhd. Johor

Design and Build Recycle Glass System

2007
KIG Glass Factory, Johor

Demolition Work for Steel Structure, Mechanical Equipment, and Piping.

2006
Samsung Corning, Negeri Sembilan

Equipment Recondition and Modification (Shutdown Work)

2006
FGM Synctech Manufacturing Sdn Bhd.

Fabrication and Installation of 20,000 lpd Quantum Resonance Water Processing System

2005
Nippon Electric Glass Malaysia, Selangor

Equipment Installation and Modification Work (P9 Project)

2004
Samsung Corning, Negeri Sembilan

Installation and Dismantle Work of Slurry System

2003
Vita Billion, Selangor

Fabrication and Installation of Quantum Resonance Water Processing System

2003
Malaya Glass, Johor

Fabrication and Installation of Cooling Duct and Furnace Dismantle Work

2002
Rikevita Ema, Johor

Equipment Installation and Scaffolding Work

2001
Simewa Corporation, Kuala Lumpur

Equipment Installation and Waste Transferring System (Jinjang Project)

2001
Nippon Electric Glass Malaysia, Selangor

Equipment Installation and Fabrication (M8-T Project)

2001
Nippon Electric Glass Malaysia, Selangor

Equipment Installation, Tank and Structure Fabrication and Installation

2001
Nippon Electric Glass Malaysia, Selangor

Preheat Oven Fabrication and Installation

2001
Nippon Electric Glass Malaysia, Selangor

Equipment Installation, Exhaust Ducting and Piping Fabrication and Installation (M7 Project)

2001
Samsung Corning, Negeri Sembilan

Equipment Installation, Piping Fabrication and Installation, Shutdown Work

2001
Nippon Electric Glass Malaysia, Selangor

Vibrating Conveyor Fabrication and Installation (M7 Project)

2000
Nippon Electric Glass Malaysia, Selangor

Equipment and Piping Modification Work (P5 & 6 Project)

2000
Nippon Electric Glass Malaysia, Selangor

Equipment and Piping Modification Work (P1-2-3 Project)

2000
Nippon Electric Glass Malaysia, Selangor

Equipment Installation and Piping Fabrication and Installation (M3-5 and M6-2 Project)

2000
Nippon Electric Glass Malaysia, Selangor

Mechanical Works and Piping Fabrication and Installation (M2-T Project)

2000
Titan Chemical, Johor

Piping Fabrication and Installation

2000
Nippon Electric Glass Malaysia, Selangor

Site Erection of Electrostatic Precipitator

2000
Titan Chemical, Johor

Stationary and Rotating Equipment Installation (Polyethylene 100KTA HDPE Plant)

1999
Titan Chemical, Johor

Supply of Crane and Heavy Lifting (TPP2-Project)

1999
Nippon Electric Glass Malaysia, Selangor

Site Modification of Funnel Press Machines

1999
Titan Chemical, Johor

Piping Fabrication and Installation, Equipment Installation (Polyethylene 500 Plant)

1997
Reba Process Line, Penang

Steel Structure and Equipment Installation

1997
Hitachi Chemical, Johor

Site Erection and Rotating Equipment Installation (J-4 Project)

1996
Asahi Furnace, Sarawak

Ducting Fabrication and Furnas Equipment Installation

1996
Hitachi Electronic, Johor

Fabrication and Erection for Equipment

1996
Hitachi Chemicals, Johor

Site Installation of Coating Machine

1996
Natsteel, Singapore

Fabrication and Erection of Cooling Base

1995
Lembaga Padi Negara (LPN), Perak

Description: 700KW (2 Unit) Rice Husk Fired Power Plant Erection

1995
Lembaga Padi Negara (LPN), Perak

Plant Revamping